99 Queen Victoria Street is a remarkable example of reimagined architecture with an array of outstanding green, energy efficient features in a modernised 86,000 sq ft HQ and a panoramic 3,000 sq ft roof terrace with views overlooking St Paul’s and the River Thames.
Targeted accreditations
Be the first to partner with the new Fidelity Real Estate Climate Impact Fund
Net Zero Embodied Carbon
Roof terraces and
Sky lounge open to all
Sustainable
transport
NABERS Design for Performance Target Rating of 5 stars
EPC A
Rating
Wired Score
Platinum
Rainwater
harvesting
New efficient M&E
and gas removal
BREEAM
Outstanding
Nothing goes to waste.
To minimise the carbon cost of delivering the building, Fidelity European Real Estate Climate Impact Fund has elected to refurbish to the highest standard without demolishing the existing structure. All materials used during construction are sustainable with the focus on recycled, renewable and locally sourced resources. The building is fitted with energy efficient equipment throughout including the incorporation of solar panels on the roof, further reducing its operational carbon footprint.
Sky’s the limit
Enjoy stunning views of the London skyline with capacity for over 200 people. Offering an ideal place to work, relax and unwind with built in power, AV and a kitchen.
With five tube stops, two overground links, major bus and cycle routes and ferry access across the bridge, you are as connected as any location in Central London.
St. Paul’s - 4 minute walk
One New Change - 4 minute walk
Bank - 5 minute walk
Mansion House - 2 minute walk
Cannon Street - 1 minute walk
Bankside Ferry - 5 minute walk
Tate Modern - 6 minute walk
Blackfriars - 5 minute walk
Blackfriars Pier - 4 minute walk
The Space
Schedule of areas
Specification
-
Office floor plate
• 150mm (overall) raised access floors to G-4th
• 300mm (overall) raised access floor to Atrium Floor
• 2700mm FCL to all office floor plates
• 3275mm from FFL to u/side of slab above on floors G-4th
• 3575mm from FFL to u/side of slab above on Atrium Floor
• 2800mm -6375mm FCL to reception
• 1.5m planning grid
• Concrete soffit with exposed services and acoustic modular raft ceiling with plasterboard margins.
• Fully accessible raised modular floor 600x600mm
• Completed to CAT A
• Central glazed atrium with full height frameless glass providing dual natural light to officeOccupancy
• Offices designed to a workplace density of 1 person per 8 sq m of Net Internal Area
• Means of escape at 1 person per 8 sq m of Net Internal Area
• WC provision at 1 person per 10 sq m; 100% unisex toilet with 100% utilisationWC Facilities
• High-quality self-contained gender neutral WC cubicles
• Porcelain tiles to walls and floors with feature timber panelled wall and flush doors
• Feature lighting within corridor below exposed soffitStairs
• Precast concrete stairs with carpet finish
• Solid core doors with stain lacquer finish -
New Entrance
• New glazed 4.1m high revolving door and side pass doors provide access into the new reception space
• Entrance is framed by polished stainless steel mesh portico frame with feature lighting
Reception
• High quality space incorporating reception, waiting and meeting room
• Feature glass wall with inset metallic mesh
• Combination of timber flooring (FSE certified) and terrazzo
• Gallery style track lighting set within acoustic ceiling tiles
• Glazed screen and doors opening into meeting room/ business lounge area
• Dedicated waiting area adjacent central glazed atrium
• Future provision for access control gates
Sky Lounge
• Flexible event/break out space
• Combination of timber flooring (FSE certified) and terrazzo
• Double glazed slim line aluminium fixed skylight with feature grid lighting below.Roof Terrace and Garden
• Porcelain non-slip decking
• Raised planters with landscaping framing views of St Pauls
• Integrated timber benches (FSC certified)
• Slow-release irrigation to all planting
• Lighting / Wi-Fi / Power / USB ports to all external seating areas
• Rooftop servery locationEnd of Trip Facilities
• 1 acessible parking bay
• 104 cycle parking and 27 Brompton cycle spaces
• 158 lockers
• Dedicated drying room
• 7 E-scooter and E-bike secure spaces
• Best in class showers and changing facilities
• 11 shower cubicles (5 male, 5 female and 1 accessible gender neutral)Wellness
• Dedicated wellness / yoga roomBack of House Facilities
• Building management office/ post room located on basement floor
• Central lower waste, recycling and storage area with compacting and sorting facilities. Accessed from service lift from basement to service yard
• Loading bay provided at Lower Ground Floor -
Lifts
• 4no. 13 person / 1000kg passenger lifts which serve all office floors
• Modernised goods lift between Basement and Loading bay on the ground floor for deliveries access
• Platform lifts serving the Reception and the 4th Floor Sky Lounge and the roof terrace to provide full access to all amenities in the building for all occupantsResilience
• Diverse incoming points for the fibre optic cabling into the building
• Already has 3no. carriers into the building
• Diverse building services risers with spare capacity and segregation between the Electrical, Mechanical and Data / IT risers
• Spare outgoing ways on the main switchboard for future installations
• There is facility for future temporary generator switchboard connection
• Separate landlord and tenant comms rooms
-
Lighting
• Full upgrade of lighting to high efficiency LED luminaires throughout the building
• BCO 2023 and LG7 compliant for the tenant office floorplates
• Aesthetic roof terrace lighting to ensure safe access and progressing through the spaceLighting Control
• Real-time dynamic automatic controls using IoT technology to minimise energy usage across the floorplates
• Maximise the use of natural daylight throughout the floorplates -
Heating and Cooling
• New VRF system to be installed throughout office floors which include fan coil units routing to linear grilles
• Condensers to be located at roof level
• High efficiencies gained by VRF system lowering energy costs.Ventilation
• Fresh air is 14 l/s/person (+10%) based upon 1 person per 8m2
• Filtration within the air handling units includes both bag and panel filters for pre filtration and final filtration
• Air Handling unit heat recovery provided by a run around coil with efficiencies of up to 60%Renewable Technology & Efficiency
• All Electric Building
• Photovoltaic (PV) Panels are to be installed at roof level
• ASHP air-to-water technology provides hot water to the new basement end of trip facilities
• BMS energy monitoring system proposed
• PIR control for water shut off and usage efficiency
• Leak Detection to prevent water loss
• Daylighting linking and occupancy controlsPotable Water
• Large potable water tank located at basement level which services all toilet outlets and hot water heaters throughout the buildingPlant Locations
• Roof Level – Condensers & PV Panels
• Basement Level – Transformer, Main LV switch room, air handling unit, ASHP, Potable water tank
• Floor Levels – Hot water heaters
• Tenant Comms room equipment space reserved within basement for future use
• Space allocation on the 4th floor tenant for kitchen installation with riser space for kitchen extract ductwork -
Sustainability Certifications: BREEAM and Nabers
• The refurbishment of 99 QVS will achieve a BREEAM rating of Outstanding. The project is currently on-track to achieve a BREEAM rating of Outstanding
• The refurbishment project is also undergoing a Nabers Design for Performance process and is targeting a Nabers Energy rating of 5 stars at the design stageEnergy Efficiency
• By upgrading the roof fabric, installing a solar photovoltaic system, implementing high-efficiency HVAC and lighting technologies, and replacing the gas heating solution for hot water with an Air Source Heat Pump (ASHP), we target achieving a reduction in Primary Energy Demand (PED) exceeding 70%. These measures will also result in an improved EPC rating of AWater Efficiency
• A rainwater harvesting system will be installed, projected to conserve approximately 85,000 litres of water annuallyAdaptation to Climate Change
• Designed to address the issues arising from climate change. The design strategy evaluated the building’s resilience to anticipated climate risks, including extreme weather events, and incorporated robust adaptation measures to ensure long-term sustainability and resilienceSupporting Circular Economy
• The project will reduce waste produced during refurbishment by prioritising on-site material reuse and preparing others for off-site reuse or recycling. By maximising material reuse and recycling efforts, the project aims to divert more than 90% (by weight) of nonhazardous construction and demolition waste from landfillSustainable Material Procurement
• Sustainability is a key consideration in the procurement of materials. ‘All materials will be ISO 14001, BES6001 or CARES certified, and all timber will be FSC certified.’Embodied Carbon
• Opting to refurbish an existing building rather than pursuing demolition and reconstruction results in significantly lower embodied carbon. The commitment to minimising embodied carbon will remain a priority during the construction phase of the project, with a focus on prioritising materials that are less carbon-intensive.Biodiversity
• The new roof design will include a sedum roof that will serve as a microclimate for insects and birdsSustainable Transport
• The refurbishment project will promote the use of sustainable and active transportation methods by incorporating a new storage area for e-scooters and bicycles, as well as a drying room and state of the art shower and changing facilitiesWellbeing
• The addition of a Wellness Suite / yoga studio in the basement and the external roof terrace expands the recreational offerings within the building. These features offer well-being benefits for occupiers such as opportunities for exercise or relaxation, social interaction, and connection with nature, contributing to a healthier and more vibrant workspace environment.
Contact us
Peter Gray
peter.gray@knightfrank.com
+44 (0)7765 220 528
Katie Oliphant
katie.oliphant@knightfrank.com
+44 (0)7765 250 090
Rob Macnab
rob.macnab@knightfrank.com
+44 (0)7905 300 160
Sam Boreham
samb@bh2.co.uk
020 7710 7963
07917 635 465
Jack Beeby
jackb@bh2.co.uk
020 7710 7969
07841 802 097